Arenes Construction Ltd. has been awarded the contract for the installation of permanent concrete waste ramps at nine District of Muskoka transfer stations in the amount of $1,059,254 (excluding HST).
According to a municipal staff report, temporary barriers were rented and installed in August 2023 to “mitigate potential fall hazards and create a safer waste drop-off experience.” The report notes that the temporary barriers caused some challenges with lifting materials over the barriers, and where these challenges occurred, residents were redirected to the Rosewarne Landfill.
It also notes that the rental of the barriers costs the District $9,600 per month or $115,200 per calendar year (excluding non-recoverable HST), which represents 37% of the transfer station budget.
In 2024, Tatham Engineering was retained to design permanent safety barriers for the elevated waste ramps at District transfer stations with final drawings provided in November 2024 and reviewed by the District operations team.
“The original submission from Arenes Construction… was $1,157,054 which is above the approved budget of $864,800,” noted staff who entered into a negotiation with the sole bidder and managed to reduce the cost by $97,800 “a result of overall reduction in total steel and concrete required that were not impactful on the design loading considerations for the barriers.”
Disruptions to the transfer sites will be communicated as work gets underway.
You can find the staff report HERE.
Don’t miss out on Doppler!
Sign up here to receive our email digest with links to our most recent stories.Local news in your inbox six times per week!
Click here to support local news



0 Comments