504004644_1258517079611232_6621059436748049608_n.jpg

New signalized pedestrian crosswalk for Clearbrook Trail

From the Town of Bracebridge:

Beginning in July, the Town of Bracebridge is constructing a new signalized pedestrian crossover on the east side of Clearbrook Trail at Windsong Crescent and Rosemead Close. Temporary lane closures may take place during the construction period.

The pedestrian crossover aligns with the Town’s 2023 Transportation Master Plan and Vision Zero principles, enhancing pedestrian safety and connecting the neighbourhood to the north of Clearbrook Trail to the sidewalk on the south side.

The Town is committed to maintaining a safe and orderly work site. Dust, noise, and heavy equipment will be present while work takes place. The Town will attempt to minimize disruptions and appreciates the public’s patience while it works to upgrade the infrastructure.

Don’t miss out on Doppler!Sign up here to receive our email digest with links to our most recent stories.
Local news in your inbox six times per week!

Click here to support local news

Join the discussion:

Your email address will not be published. Required fields are marked *

All comments are moderated. Please ensure you include both your first and last name and abide by our community guidelines. Submissions that do not include the commenter's full name or that do not abide by our community guidelines will not be published.

0 Comments

    Get local news delivered right to your inbox for free. Unsubscribe at anytime!